{"id":28609,"date":"2016-04-15T04:00:00","date_gmt":"2016-04-15T08:00:00","guid":{"rendered":"https:\/\/goebt.com\/https-blog-cdesolutions-com-2016-04-cde-goes-lean\/"},"modified":"2025-06-30T11:59:09","modified_gmt":"2025-06-30T15:59:09","slug":"cde-goes-lean","status":"publish","type":"post","link":"https:\/\/goebt.com\/cde-goes-lean\/","title":{"rendered":"CDE Goes &#8220;Lean&#8221;"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><em><strong>CDE was founded with the dedication to changing the ways businesses handled the acquisition, distribution, and maintenance of their critical point of sale terminals.<\/strong><\/em>\u00a0 This spirit of innovation has remained in the company for over 25 years and is still alive today.\u00a0 Part of our most recent efforts to continue improving our processes and making our solutions even more beneficial for our customers is the implementation of lean operations in our business.<\/p>\n<p><!--more--><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-12893\" src=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-17-03-PM.jpg\" sizes=\"(max-width: 745px) 100vw, 745px\" srcset=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-23-14-PM.jpg 373w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-17-03-PM.jpg 745w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-20-56-PM.jpg 1118w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-22-93-PM.jpg 1490w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-24-02-PM.jpg 1863w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145036-1024x238-Feb-17-2021-06-15-14-41-PM.jpg 2235w\" alt=\"20160406_145036\" width=\"745\" height=\"173\" \/><\/p>\n<p><strong>What is lean operations?<\/strong><\/p>\n<p>\u201cLean\u201d is a method used for eliminating waste within a system.\u00a0 This waste not only includes actual materials, but also overburden, or unnecessary work load.\u00a0 The goal of lean is to add obvious value and production to the process by reducing as much as possible.\u00a0 With the use of lean manufacturing or production, companies have the opportunity to greatly increase their rates and levels of production by minimizing time spent, material used or thrown out, and even the stress put on workers.<\/p>\n<p><strong><img decoding=\"async\" class=\"alignleft wp-image-12901 size-medium\" src=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-23-39-PM.jpg\" sizes=\"(max-width: 245px) 100vw, 245px\" srcset=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-14-67-PM.jpg 123w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-23-39-PM.jpg 245w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-19-96-PM.jpg 368w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-23-85-PM.jpg 490w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-19-50-PM.jpg 613w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145136-e1460749817461-245x300-Feb-17-2021-06-15-20-33-PM.jpg 735w\" alt=\"20160406_145136\" width=\"245\" height=\"300\" \/>How did CDE implement lean?<\/strong><\/p>\n<p>CDE is growing quickly and we\u2019re always adding valuable knowledge and expertise to the company by way of great people.\u00a0 One of our newest employees, Jon Harris, was brought to the team as the Director of Operations.\u00a0 With Jon\u2019s years of experience in the field and industry, he was uniquely qualified and prepared to make the most of this role.\u00a0 Jon has done just that.<\/p>\n<p>Over the past few months, the CDE operations team was able to completely re-evaluate the way they were doing their jobs and identify areas where the process may not have been maximizing production.\u00a0 This very critical method of analysis included recording every step each member of the team took in their roles and even the time each step took, down to the second.\u00a0 With this information, the team was able to determine what parts of their process could be eliminated or reduced.<\/p>\n<p>Through the changes to the actual processes and the adjustments to work station location, organization, and flow, CDE\u2019s deployment line is now optimized to handle five to six times more volume.\u00a0 The improvements are even expected to reduce the time for repair and deployment per unit by 40%.<\/p>\n<p><strong><img decoding=\"async\" class=\"alignright wp-image-12896\" src=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-22-70-PM.jpg\" sizes=\"(max-width: 175px) 100vw, 175px\" srcset=\"https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-17-52-PM.jpg 88w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-22-70-PM.jpg 175w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-22-51-PM.jpg 263w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-19-70-PM.jpg 350w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-23-57-PM.jpg 438w, https:\/\/goebt.com\/wp-content\/uploads\/2025\/01\/20160406_145123-e1460749330104-576x1024-Feb-17-2021-06-15-17-27-PM.jpg 525w\" alt=\"20160406_145123\" width=\"175\" height=\"311\" \/>How will CDE use lean?<\/strong><\/p>\n<p>CDE has implemented lean in our warehouse where we not only repair and program point of sale terminals, but also send and receive shipments and manage inventory.\u00a0 This implementation has included a full build out of lean-friendly work stations, and even the reorganization of the inventory.<\/p>\n<p>With the implementation of lean, CDE will not only increase the rate at which they repair and remanufacture units, but also the efficiency of deployment and retrieval services.\u00a0 Instead of having an operations division that is divided into multiple parts, the implementation of lean has more closely joined these processes and, therefore, streamlined the way CDE provides these solutions.<\/p>\n<p><strong>What happens after lean is implemented?<\/strong><\/p>\n<p>One key part of having a lean organization is the continuous improvement of processes.\u00a0 CDE now has the opportunity to more easily monitor the workflows and make adjustments where necessary, with the new, clean set up.\u00a0 We understand that providing point of sale terminal solutions will continue to be an evolutionary business, which makes lean a perfect fit for the work we do.\u00a0 Now, as we continue to scale and even add to the work we do, adapting the workflow will be much easier.<\/p>\n<p>Like any major change to the operation of a company, the implementation of lean has been a journey with plenty of challenges, both large and small. \u00a0Jon explained that the flexibility of lean and the opportunity for growth greatly outweighs any challenges the implementation has presented thus far.\u00a0 The CDE team has worked hard on this project, from start to finish, and is greatly anticipating seeing the benefits of lean in action.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; CDE was founded with the dedication to changing the ways businesses handled the acquisition, distribution, and maintenance of their critical point of sale terminals.\u00a0 This spirit of innovation has remained in the company for over 25 years and is still alive today.\u00a0 Part of our most recent efforts to continue improving our processes and [&hellip;]<\/p>\n","protected":false},"author":244,"featured_media":28632,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[1],"tags":[204],"class_list":["post-28609","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-important-announcement","tag-cde-news"],"_links":{"self":[{"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/posts\/28609","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/users\/244"}],"replies":[{"embeddable":true,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/comments?post=28609"}],"version-history":[{"count":4,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/posts\/28609\/revisions"}],"predecessor-version":[{"id":32675,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/posts\/28609\/revisions\/32675"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/media\/28632"}],"wp:attachment":[{"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/media?parent=28609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/categories?post=28609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/goebt.com\/wp-json\/wp\/v2\/tags?post=28609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}